JPL JET PROPULSION LABRATORY
Flight Electronics Integration Facility (FEIF) Building
PLANNET helped JPL create the-state -of-the-art wired and wireless cable infrastucture, audiovisual syatems, and security systems for their first 100% new laboratory facility in 30 years. The new 5-story 88,000 SF LEED Gold building includes: design of laboratory spaces for electronic and microelectronic engineering, fabrication, testing and assembling to support missions across JPL. PLANNET's work included design, bid management and construction administration of: wired/wireless voice/data cable infrastructure for Outside Plant (OSP) and interiors. design of the technology rooms,audiovisual systems and security systems.
JPL Walkway View JPL OverheadView

PROJECT DETAILS

    Markets

  • Corporate

    Services

  • Technology Consulting
  • Physical Security
  • Cabling Infrastructure
  • Audiovisual

    Other Info

    • 88,000 SF

    • Pasadena, CA

    • LEED Gold-certified

    • JPL’s first new laboratory in 30 years

    • Multiple Laboratories and testing spaces

    Jet Propulsion Laboratory (JPL)

    PLANNET has played a vital role in supporting JPL on a range of critical infrastructure projects, including major tenant improvements for both Building 301 and Building 303, each totaling 40,000 square feet. Most notably, PLANNET contributed to the Flight Electronics Integration Facility (FEIF), a ground-up, five-story, 88,000-square-foot LEED Gold-certified building located in Pasadena, California.

    Among these collaborations, the FEIF Building stands out as a milestone development. It is JPL’s first completely new laboratory facility in over three decades and was designed to advance the agency’s electronic and microelectronic engineering capabilities. The facility includes state-of-the-art spaces for fabrication, testing, and assembly, all tailored to support a wide range of JPL missions. It also features Class 10K cleanrooms, specialized laboratories for research and prototyping, areas for parts storage, and integration and testing zones, along with offices and meeting spaces designed to promote collaboration across multidisciplinary teams.

    PLANNET’s responsibilities included designing, managing bids, and administering the construction of wired and wireless voice/data cable systems for both the Outside Plant (OSP) and interior environments. In addition, PLANNET led the design of the technology rooms, audiovisual systems, and security systems, ensuring a seamless and future-ready technological foundation for JPL.

    Related Projects

    SPEAK WITH ONE OF OUR EXPERTS!

    SIGN UP FOR A COMPLIMENTARY PHONE CONSULTATION.

    OR CALL US TODAY AT 714.982.5800

    LATEST NEWS, IDEAS AND
    RESOURCES FROM PLANNET